Engineering & Specification
Functional specification, safety matrix, hardware selection, network planning to NAMUR — the basis everyone refers back to later.
From PLC programming through commissioning to retrofit, program recovery and AI-assisted data analysis – engineering services for modern production lines in the Saar-Lor-Lux region.
Three areas, one point of contact. Channels with a branch lead to the full description.
Control, visualization, drives and commissioning — from the functional specification to acceptance.
S5 and S7-Classic to S7-1500 or S7-1200, WinCC Flexible and Comfort to Unified. The plant keeps running; the changeover happens in the shutdown window.
View serviceWAGO 750/PFC and Beckhoff TwinCAT to S7-1500 with WinCC Unified. The existing code is read and documented; program and HMI are rebuilt in TIA Portal.
View serviceFunctional specification, safety matrix, hardware selection, network planning to NAMUR — the basis everyone refers back to later.
TIA Portal for S7-1200/1500 (incl. F), STEP 7 Classic for S7-300/400 (incl. F). Structured to IEC 61131, ProfiSafe included.
View serviceWinCC Comfort, Advanced and Unified. Faceplates, recipe management, alarm archive, multilingual operator interfaces.
View serviceSINAMICS, SEW and Danfoss via PROFIdrive. Positioning, synchronization, servo axes.
PID loops for pressure, temperature, flow and level. Process optimization and quality assurance.
On-site commissioning worldwide, function testing, acceptance, operator training. Experience on four continents.
View serviceWhen all that remains is an online snapshot without symbols: re-documentation from the running system, reconstruction from scanned circuit diagrams.
You supply the cabinet and the installation, we supply the program, visualization, system test and commissioning. Your customer gets one complete project.
View serviceSecuring the automation layer up to the boundary with the office network. Corporate IT is not part of it.
Network structure of the automation layer, separation of individual plant cells and a controlled transition to the office network — instead of a flat network where every controller reaches every other.
A connection the plant establishes outbound, released on site instead of standing permanently open. Over cellular where no plant network is available — with a site assessment beforehand rather than trial and error.
User and permission concept, firmware and patch levels, shutting down services that are not needed. Plus technical groundwork for NIS2 requirements at plant level.
Making what the plant produces usable — in analysis, in reports, in the ERP.
Opening up data sources in the controller and passing them upward cleanly — OPC UA, MQTT, database.
View serviceFault and downtime analysis, shift and maintenance schedules, machine data into ERP or dashboard.
How our projects are built, in daily use rather than a test setup: program drafts checked against the functional specification, AI-assisted re-documentation, machine evaluation of technical documents. Review and commissioning stay with the engineer.
8 Steps for Successful Project Execution
Functional Design Specification (FDS): Specify plant function, integrate safety matrix, automation concept (P&ID), verify hardware compatibility
Siemens TIA Portal / STEP 7 Classic, F-programming for safety functions, structured programming in STL/FBD/LAD/SCL, hardware configuration and network setup
WinCC (Unified, Comfort, Advanced), visualization with templates, recipe management, user management, alarming, trends, diagnostics
Functional testing at workshop, Controller simulation, Hardware-in-the-Loop (HIL), Testing of All Scenarios
Variable Frequency Drives (VFD), Servo Axes, SINAMICS G120/S120 Integration via PROFIdrive, Positioning with Technology Objects
Optimize PID control loops, Fuzzy Logic for complex processes, Throughput optimization, Quality assurance (SPC)
Hardware installation, Network configuration, On-site functional testing, Troubleshooting and optimization, Documentation
Operator and maintenance training, final on-site acceptance, Documentation handover, Service agreements
Proven automation technology for industrial production facilities
Selected automation engagements across manufacturing and process industries.
12/2018 – 02/2019 · Tobacco manufacturing
Germany (DACH): Siemens S7-315-2 DP, MicroHAWK ID-40 cameras and RS232 interfaces deliver end-to-end pouch and case tracking on the cartoner.
11/2022 – 07/2023 · Tobacco manufacturing
Poland (EMEA): Siemens S7-1511F, TOMRA Helius sorter and string remover ensure foreign material detection with cross-line ProfiSafe communication.
04/2023 – 2024 · Tobacco manufacturing
Germany (DACH): ek robotics AGVs, Siemens S7-414F controls and WinCC link hall 8 and hall 2, including buffer conveyors, barcode validation and shuttle integration.
Answers on retrofit, program recovery, AI-assisted data analysis and commissioning in the Saar-Lor-Lux region
Commissioning of new production lines and retrofit of existing systems – both equally weighted. Based in Luxembourg, on site at short notice in Saar-Lor-Lux, projects in Switzerland and across the DACH region, commissioning worldwide. Engineering at a fixed price after review; commissioning is usually billed on a time basis (hourly or daily rates).
S5 and S7-300/400 to S7-1200 or S7-1500 (Failsafe variants included) with TIA Portal, plus HMI retrofit to WinCC Unified (from WinCC Flexible, WinCC Comfort/Advanced or older touch panels). Complete package: program conversion, hardware migration, commissioning and operator training – with minimal downtime.
Yes. Typical case: only an online snapshot available, data blocks not documented, no network comments. The basis for reconstruction is online snapshot + scanned E-Plan pages. From these we reconstruct symbols and documentation, AI-accelerated. Works for S5 and S7-Classic (S7-300/400). On request directly combined with migration to TIA Portal.
WinCC Flexible (S7-300/400 world) and WinCC Comfort/Advanced (the old TIA WinCC) cannot be auto-migrated to Unified – all screens must be rebuilt. AI-assisted workflows take the grunt work (pre-generating screens), followed by manual refinement. Often combined in the same retrofit step with the PLC migration.
Looking at it from the automation side, we show what your plant data can be used for, and then we implement it: data access via OPC UA, dashboards, fault and downtime analysis and reporting. AI evaluates the data read-only; the PLC stays deterministic. What you end up with is analysis running in your plant, not a slide deck.
We are based in Stadtbredimus, Luxembourg, on the Moselle right at the German border. Within Saar-Lor-Lux we can be on site at short notice: Luxembourg, Saarland (Saarbrücken, Saarlouis, Merzig-Wadern), Rhineland-Palatinate (Trier, Saarburg, Bitburg) and Lorraine – from Stadtbredimus it takes approx. 35 minutes to Merzig and approx. 40 minutes to Trier or Saarlouis. Beyond that, we take on projects across the DACH region (Germany, Austria, Switzerland) and commissioning worldwide, with over 30 international commissionings on four continents so far. Projects in Switzerland are handled through remote engineering combined with on-site commissioning: PLC programming for projects in Switzerland.
By phone (Luxembourg +352 26709351, Germany +49 176 34450924) – preferred, person to person. Alternatively by email to info@prybisch-automation.eu or via the contact form. Response within 24 hours on working days. Initial consultation free of charge. Engineering is quoted at a fixed price after review; commissioning is usually billed on a time basis.
Free initial consultation – response time < 24h business days
✓ Non-binding consultation ✓ Response time < 24h on business days ✓ International